It has been a busy week and a half for me as well as at the house. Over the past week and a half, they finished taping the drywall, textured the walls and ceiling, painted and prepped to install the hardwood flooring.
Ceiling texturing:
Wall texturing:
Master bedroom paint color:
Spare bedrooms paint color:
Bathrooms paint color:
Living room paint color:
The hardwood flooring:
No comments:
Post a Comment